Valve assembly of guangzhou water supply company. Water like the blood of the city. As urban water demand grows, the growing number of water filling stations, expanding and decentralized, the traditional four-shift and three-fold management model is no longer applied. To this end, guangzhou's unescorted water company has intellectually transformed water supply stations. What "black technologies" are left unattended at the compression station?
There are currently 50 water loading stations in guangzhou, located in the south-east and north-west of the city, which perform a complex thin function. Accumulating and increasing the impact of water at pressurized stations, accumulating it at low levels, replenishing it at peak water, regulating irregular peaks, ensuring stable pressure on water supply at different times. Translation into Russian